Click a transmission line to trip it and trigger a cascade · drag isn't needed, layout is fixed
Grid Conditions
Higher = more wind/solar sited far from demand, less spinning inertia. Lines run closer to capacity and shocks propagate faster and farther.
Higher = reinforced / parallel transmission capacity added to the network, raising the margin before a line trips.
Live Readout
0 / 0
lines tripped
0%
capacity lost
1
grid islands
Nominal
grid status
Legend
Healthy line (load < capacity)
Overloaded — about to trip
Tripped, then goes dark
Dead / de-energized line
Line thickness ≈ capacity. Node ring fills with load/capacity ratio.
Try it: push decarbonization high and investment low, trip a busy backbone line — watch one click fragment all of Europe. Then raise investment and hit "Replay same trigger": the same click barely ripples.